In February 2023, we received a commission from a well-known South Korean semiconductor company to urgently import a batch of LED brackets to China. These products have three distinctive features:
At the project kickoff meeting, we immediately formed a special team consisting of customs declaration manager, logistics specialist, and document reviewer. Preliminary research found that clients were most concerned aboutClearance time efficiencyandCompliance risk controltwo core issues.
We required clients to provide basic documents 14 working days in advance, with special emphasis on:
A minor incident occurred during actual operations: The composition report provided by the South Korean manufacturer didnt include cadmium content testing. We immediately activated emergency measures by arrangingthird-party laboratory expedited testingFinally, the key documents were completed before shipment.
Link | Standard duration | III. The blitzkrieg of Shanghai airport clearance | Optimization Measures |
---|---|---|---|
Arrival declaration | 1 working day | 0.5 day | Pre-entry system |
Customs Document Review | 0.5 working day | 0.3 days | Electronic payment guarantee |
Inspection operations | Days 15-18 | 9 days | AEO priority inspection |
In this case, we achieved results through:
Analysis revealed:
Through coordinated efforts across our branches in Foshan, Shanghai, Dongguan, etc., we achieved:
Based on this case, weve developed semiconductor material import3×3 principle:
Through this case, we once again verify: professionalImport Representationis not simply running errands, but requirestechnical services + risk control + resource integrationcomprehensive capabilities. Especially in the current international trade environment, choosing partners with practical experience can often achieve twice the result with half the effort.
If you are planning to import similar products, feel free to contact our expert team forfree import solution evaluationservices.
? 2025. All Rights Reserved. Shanghai ICP No. 2023007705-2 PSB Record: Shanghai No.31011502009912