Home»Import Representation» How Can New District Enterprises Avoid Millions in Losses When Importing Wire EDM Machines?
Three Hidden Traps in Importing Wire EDM Machines
Since the implementation of the Yangtze River Delta New District Manufacturing Upgrade Plan in 2025, the demand for wire EDM machines from precision mold enterprises has surged. A local enterprise, when independently importing Mitsubishi FA20 series equipment from Japan, failed to correctly declare the CNC system parameters, resulting in the equipment being detained at customs for 37 days and incurring 280,000 yuan in demurrage fees. This case reveals three major risks that must be noted when importing equipment:
Mechanical and electrical certificate processing delay: Not reserving the 15 working days required for Ministry of Commerce approval
Missing technical parameters: Omitting key indicators such as laser positioning accuracy (±0.001mm)
Standardized operating procedures of professional agencies
Compared with self-customs clearance by enterprises, professional agency companies can reduce import cycles by 40%. Taking a Suzhou agency company handling Swiss GF machining systems as an example:
Pre - filing stage
Completion of the mechanical and electrical product import application form within 7 working days
Pre-classification HS code accuracy rate of 98%
Transportation control link
30% reduction in specialized anti-vibration packaging costs for precision equipment
Real-time tracking of 15 international port dynamics
Customs inspection response
Pre-review document issue resolution rate of 92%
Average local inspection time reduced to 1.8 days
Quantitative analysis of agency service value
According to 2025 Yangtze River Delta customs data, professional agencies can save comprehensive costs by approximately 187,000 yuan per batch compared to self-operation by enterprises:
Demurrage risk cost: Reduced by 97%
Document Error Rate: From 23% to 2.6%
Equipment debugging cycle: Shortened by 14 working days
Solutions to Typical Problems
In response to recent frequent customs queries, we recommend the following measures:
Accuracy parameter disputesPrepare NIST certification test report
Software version verificationPre-register control system source code
Determination of old equipment ageConduct metal fatigue testing using a spectrometer